My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-11_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2013-03-11_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:46 PM
Creation date
3/11/2013 2:40:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
3/11/2013
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Western Fuels Association, Inc
Type & Sequence
TR1
Email Name
MLT
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Doug White, Western Fuels <br />C- 2010 -089 TR -01 PAR <br />Mar. 11, 2013 <br />Page 9 of 9 <br />WFC: Included with this submittal is a document for inclusion into Appendix <br />2.05.3(4) -6 that addresses that the faces and slopes of the embankment are being <br />planted during the first growing season to establish vegetation. <br />DBMS: Response accepted. <br />4.05.9(10) - Is there adequate freeboard to prevent overtopping by waves or sudden increases in <br />volume? <br />7. DBMS: Please provide a statement addressing this requirement. <br />WFC: Included with this submittal is a document that addresses adequate <br />freeboard. As stated in the WFC response to Item 5 in the Surface Water <br />Hydrology section of this document above, the freeboard of the pond during the <br />sudden increase in volume as a result of a 25yr -24hr event is 2.88 ft. This <br />freeboard is sufficient to prevent overtopping by waves. <br />DBMS: Response accepted. <br />4.05.9(14) - Was the impoundment inspected by qualified registered P.E. or specialist? <br />(a) Regularly inspected during construction, and upon completion of construction? <br />Lambert and Associates inspected the operation and conducted compaction tests <br />on a regular basis, and the certification has been provided. Item satisfactorily <br />addressed in MR -02 submittal. <br />All adequacy comments, with the exception of Surface Water Hydrology items 5 and 8, have <br />been successfully addressed. Please submit information addressing the remaining comments, so <br />that the revision application may be approved. You are welcome to contact me with any <br />questions you may have. <br />Sincerely, <br />ON M M � <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist <br />cc: Sandy Brown, DRMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.