My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-07_REVISION - C1981035 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2013-03-07_REVISION - C1981035 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:38 PM
Creation date
3/11/2013 10:58:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
REVISION
Doc Date
3/7/2013
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
GCC Energy, LLC
Type & Sequence
RN6
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />March 7, 2013 <br />Tom Bird <br />GCC Energy, LLC <br />6473 County Road 120 <br />Hesperus, CO 81326 -9633 <br />Re: Proposed Decision <br />Permit Renewal Application No. 6 (RN -6) <br />King Coal Mine (Permit No. C- 1981 -035) <br />Dear Mr. Bird: <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision <br />Package for Permit Renewal No. 6 at the King Coal Mine. Notice of the proposed decision <br />will be published in The Durango Herald as soon as possible. The first publication will initiate <br />the thirty (30) day public comment period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that copies of the approved <br />renewal materials were sent to the Office of Surface Mining and the Bureau of Land <br />Management. The materials should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the <br />amount of Bond Held equals or exceeds the Revised Liability, you need not submit additional <br />bond. However, if the Revised Liability exceeds the Bond Held, please submit additional bond <br />or rider to your existing bond that equals or exceeds the Revised Liability. The permit will not <br />be issued until the Division has received and approved the bond. <br />If there are stipulations attached, please sign and return the proposed decision form to the <br />Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Marcia L. Talvitie, P.E. <br />Environmental Protection Specialist <br />Enclosure <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.