My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-03-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:36 PM
Creation date
3/11/2013 7:30:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/7/2013
Doc Name
Weekly CQA Reports: Weeks ending 2/16/2013 & 2/23/2013.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CL <br />&V <br />During the reporting period drilling delineation commenced on historical opening No. 372, No. 1110, No. 1109, <br />further drilling delineation investigations continue. In addition excavation occurred on historical working No. 56, <br />which is ongoing, historical No.1114, and M13 was determined to be a prospector's pit. <br />Underground working delineation drilling and investigations continue. <br />C) Highway 67 <br />Seed Masters continued to "grind and chip" stockpiled trees and brush west of the HWY 67 crossing. <br />MHT #2 is in place and is working properly. No other work was performed for the existing HWY 67 crossing during <br />this reporting period. <br />II) Storm Water Management <br />A) Best Management Practices (BMP) are being performed. Inspections continue and there have been no <br />issues identified. <br />CQA ACTIVITIES: <br />1) Field Activities: Construction activities and observation of clearing and grubbing, structural fill and compaction, <br />underground workings, HWY 67 progress observation were some of the tasks performed in the field as required to <br />project specifications.. <br />II) Laboratory Activities: Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture- Density, <br />gradations and material identifications) compressive strength testing were some of the laboratory testing performed <br />during this reporting period as required to project specifications. <br />General Project Items <br />Meetings and Discussions: None at this time. <br />Summary of Concerns: None at this time <br />CC& V: Working with CC &V Daily updates and reporting. A weekly Project Status meeting was held at 11:00am on February 12th <br />between CC &V, CDOT, Ames and Amec. Topics discussed were Safety, Schedule, Project Issues, concems and planning. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Thome Clark <br />Thorne M Clark <br />Amec Project Resident <br />Ph: 970.846.9337 <br />amec <br />Date: 02.16.13 <br />Page 2 of 5 MLE2 WE 02. t 6.l 3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.