Laserfiche WebLink
Yoast Mine C1994082 Surety Increase SI -1 Page 83 of 93 <br />Haul Time: 7.266 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />10000.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />3.509 <br />Loading Tool unit <br />Production 242.14 <br />Truck Unit Production <br />Optimal No. of Trucks: 6 <br />Return Time: 3.509 <br />Total Truck Cycle Time: 13.955 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 137.11 <br />Adjusted single truck/loader team production: 137.11 <br />Adjusted multiple truck/loader team production: 137.11 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.876 /LCY <br />minutes <br />minutes <br />200.98 LCY/Hour <br />34.28 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 291.74 Hours <br />Total job cost: $115,049.56 <br />CIRCES Cost Estimating Software <br />