Laserfiche WebLink
Yoast Mine C1994082 Surety Increase SI -1 Page 81 of 93 <br />TRUCK/LOADER TEAM WORK <br />Task description <br />Site: Yoast Mine <br />Clean Sediment Ponds 010, 011, 011A, 012,012A and 014 Twice <br />Permit Action: Surety Increase SI1 Permit/Job #: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 081 State: Colorado <br />Date: 9/12/2012 County: Routt <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: Generic 8 -10 cy, 6x4 <br />- Loader: Cat 336D L 10' -6" Stick <br />Support Equipment -Load Area <br />-Dump Area <br />Road Maintenance —Motor Grader <br />-Water Truck <br />NA <br />NA <br />NA <br />NA <br />Abbreviation: None <br />Filename: C082 -081 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauinment Maintenance Eauinment <br />Total work team cost/hour: $394.35 <br />MATERIAL QUANTITIES <br />Initial volume: 40,000 CCY Swell factor: 1.000 <br />Loose volume: 40,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,700 Pounds/LCY <br />Earth - Wet excavated <br />27,280 Pounds <br />10.10 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$9.13 <br />$42.44 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$49.72 <br />$77.83 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$58.85 <br />$158.95 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $394.35 <br />Support: $0.00 <br />Maine $0.00 <br />Total work team cost/hour: $394.35 <br />MATERIAL QUANTITIES <br />Initial volume: 40,000 CCY Swell factor: 1.000 <br />Loose volume: 40,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) <br />t) <br />Material weight <br />Description <br />Rated Payload <br />Payload Capacity <br />asis: <br />2,700 Pounds/LCY <br />Earth - Wet excavated <br />27,280 Pounds <br />10.10 LCY <br />CIRCES Cost Estimating Software <br />