My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-21_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2012-09-21_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:08:34 PM
Creation date
3/8/2013 8:36:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/21/2012
Doc Name
Cost Estimate
From
DRMS
To
File
Type & Sequence
SI1
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yoast Mine C1994082 Surety Increase SI -1 Page 3 of 93 <br />Task description <br />Site: Yoast Mine <br />BULLDOZER WORK <br />Grade Valora Pit N/S Highwall <br />Permit Action: Surety Increase SI1 <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado <br />Date: 9/12/2012 County: Routt <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />JIPMENT COST <br />Cat DI IR - 11U <br />850 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Permit /Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -02a <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL OUANTITIES <br />Initial Volume: 245,600 <br />Swell factor: 1.000 <br />Loose volume: 245,600 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />150 feet <br />2,036.8 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -25% <br />Average site altitude: 7,800 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Sandstone <br />Job Condition Correction Factor <br />Source <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$131.18 <br />NA <br />Operating Cost/Hour: <br />$274.62 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL OUANTITIES <br />Initial Volume: 245,600 <br />Swell factor: 1.000 <br />Loose volume: 245,600 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />150 feet <br />2,036.8 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -25% <br />Average site altitude: 7,800 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Sandstone <br />Job Condition Correction Factor <br />Source <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.