Laserfiche WebLink
Yoast Mine C1994082 SL -4 <br />Page 90 of 90 <br />Nearest Major City or Town within project area region: <br />HAYDEN <br />Total one -way travel distance: <br />10.00 miles <br />Average Travel Speed: <br />30.00 mph <br />Total Non - Roadable Mob/Demob Cost * <br />$52,653.56 <br />`* two round trips with haul rig: <br />0.67 <br />Total Roadable Mob/Demob Cost ** <br />$1,267.80 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.33 <br />0.33 <br />0.33 <br />0.33 <br />2.50 <br />NA <br />2.50 <br />NA <br />5.67 <br />0.67 <br />Total job time: 11.33 Hours <br />Total job cost: $53,921.36 <br />