Laserfiche WebLink
Yoast Mine C1994082 SL -4 Page 88 of 90 <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.33 <br />0.33 <br />0.33 <br />0.33 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.67 <br />0.67 <br />Total job time <br />$72.69 <br />3.33 Hours <br />Total job cost: $2,651.67 <br />