My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-12_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2012-09-12_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:54 PM
Creation date
3/8/2013 7:57:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/12/2012
Doc Name
Cost Estimate
From
DRMS
To
File
Type & Sequence
SL4
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yoast Mine C1994082 SL -4 Page 82 of 90 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean Sediment Ponds 010, 011, 011A, 012,012A and 014 Twice <br />Permit Action: Partial Phase I Bond <br />Site: Yoast Mine Release SL -04 Permit/Job #: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 081 State: Colorado <br />Date: 9/12/2012 County: Routt <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: Generic 8 -10 cy, 6x4 <br />- Loader: Cat 336D L 10' -6" Stick <br />Abbreviation: None <br />Filename: C082 -081 <br />Shift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $394.35 <br />MATERIAL QUANTITIES <br />Initial volume: 40,000 CCY Swell factor: 1.000 <br />Loose volume: 40,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$9.13 <br />$42.44 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$49.72 <br />$77.83 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$58.85 <br />$158.95 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $394.35 <br />Support: $0.00 <br />Maine $0.00 <br />Total work team cost/hour: $394.35 <br />MATERIAL QUANTITIES <br />Initial volume: 40,000 CCY Swell factor: 1.000 <br />Loose volume: 40,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.