Laserfiche WebLink
Yoast Mine C1994082 SL -4 Page 52 of 90 <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.095 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4924 <br />Adjusted unit production: 1,413.34 LCY/hr <br />Adjusted fleet production: 2826.68 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.314/LCY <br />Total job time: <br />Total job cost: <br />0.63 Hours <br />5560.80 <br />