Yoast Mine C1994082 SL -4 Page 42 of 90 <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Site Altitude: 7800 feet <br />Net Correction: 0.813 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj : <br />0.980 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 7800 feet <br />Net Correction: 0.813 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />-7.10 <br />3.00 <br />-4.10 <br />2972 <br />0.53 <br />Haul Time: 0.53 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />7.10 <br />3.00 <br />10.10 <br />1476 <br />1.00 <br />Return Time: <br />1.00 <br />minutes <br />Total Scraper team cycle time: <br />3.13 <br />minutes <br />Adjusted for job conditions: <br />903.91 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />903.91 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,807.82 <br />LCY/Hour <br />Unadjusted unit production/hour: 1,111.82 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: <br />15.70 <br />Hours <br />Unit cost: $0.913 /LCY Total job cost: $25,895.79 <br />