Laserfiche WebLink
Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />1.100 <br />(CAT HB) <br />1.100 <br />(50% SL) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.516 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.9579 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />1,951.05 LCY/hr <br />3902.1 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.228/LCY <br />Total job time: <br />Total job cost: <br />62.94 Hours <br />$55,926.55 <br />