Laserfiche WebLink
Yoast Mine C1994082 SL -4 Page 37 of 90 <br />Task description: <br />Site: Yoast Mine <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />Pond 12A <br />Permit Action: Partial Phase I Bond <br />Release SL -04 <br />Task #: 037 State: Colorado <br />Date: 9/12/2012 County: Routt <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />JIPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Permit/Job #: C1994082 <br />Abbreviation: None <br />Filename: C082 -037 <br />Total unit Cost/Hour: $261.15 <br />Total Fleet Cost/Hour: $261.15 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$80.19 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$1.79 <br />25 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $261.15 <br />Total Fleet Cost/Hour: $261.15 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />9,920 <br />Swell factor: <br />1.165 <br />Loose volume: <br />11,557 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />Average push distance: _ <br />Unadjusted hourly <br />production: <br />Materials consistency description: <br />Average push gradient: 5% <br />Average site altitude: <br />175 feet <br />805.3 LCY/hr <br />7.400 feet <br />Compacted fill or embankment 0.9 <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />