Laserfiche WebLink
Yoast Mine C1994082 SL -4 Page 25 of 90 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2985 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />465.66 LCY/hr <br />931.32 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.954/LCY <br />Total job time: <br />Total job cost: <br />0.41 Hours <br />$366.80 <br />