My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-12_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2012-09-12_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:54 PM
Creation date
3/8/2013 7:57:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/12/2012
Doc Name
Cost Estimate
From
DRMS
To
File
Type & Sequence
SL4
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yoast Mine C1994082 SL -4 Page 21 of 90 <br />BULLDOZER RIPPING WORK <br />Task description: Rip Final Regraded Areas <br />Permit Action: Partial Phase I Bond <br />Site: Yoast Mine Release SL -04 Permit /Job #: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 014 State: Colorado <br />Date: 9/11/2012 County: Routt <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D1 1R - 11U <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown <br />Abbreviation: None <br />Filename: C082 -014 <br />Horsepower: 850 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />Ownership Cost/Hour: <br />$147.46 <br />NA <br />Operating Cost/Hour: <br />$274.62 <br />100 <br />Ripper Operating Cost/Hour: <br />$12.68 <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total Unit Cost/Hour: <br />$473.25 <br />Total Fleet Cost/Hour: <br />$946.50 <br />MATERIAL QUANTITIES <br />Selected estimating <br />method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: <br />NA <br />BCY NA <br />Area: 20.00 acres Rip Depth (ft): 3.50 <br />Volume: 112,933 BCY or CCY <br />Source of estimated quantity: <br />Division Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />3.51 <br />mph <br />Average Ripping Width: <br />9.83 <br />degrees <br />Average Ripping Length: <br />400.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />1.129 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />1.129 <br />Acres/hr <br />Site Altitude: <br />7,500 <br />feet <br />Altitude Adj : <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift /day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.94 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />1.87 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 2 Grader(s) <br />Total job time: <br />10.67 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.