Laserfiche WebLink
Yoast Mine C1994082 SL -4 Page 10 of 90 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.516 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.9579 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />2,749.46 LCY/hr <br />5498.92 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.162/LCY <br />Total job time: <br />Total job cost: <br />22.77 Hours <br />$20,230.89 <br />