My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-12_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2012-09-12_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:54 PM
Creation date
3/8/2013 7:57:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/12/2012
Doc Name
Cost Estimate
From
DRMS
To
File
Type & Sequence
SL4
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclamation Cost Summary - All Remaining Tasks <br />Permit Action: Partial Phase I Bond <br />Site: Yoast Mine Release SL -04 Permit/Job #: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 9/12/2012 County: Routt <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C082 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />005 <br />014 <br />021 <br />022 <br />028 <br />02a <br />02b <br />02f <br />031 <br />032 <br />033 <br />034 <br />035 <br />036 <br />037 <br />03a <br />03b <br />03f <br />040 <br />041 <br />043 <br />044 <br />046 <br />049 <br />04a <br />04b <br />052 <br />053 <br />Grade Drill Pads Associated with Minor Revision <br />18 <br />DOZER <br />2 <br />2 <br />1 <br />2 <br />1 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1.09 <br />$966.57 <br />$10,097.00 <br />$163.00 <br />$366.80 <br />$4,419.00 <br />$55,926.55 <br />$6,932.15 <br />$1,583.57 <br />$7,887.22 <br />$25,130.24 <br />$13,991.85 <br />$91.00 <br />$164,825.93 <br />$7,477.28 <br />$11,678.70 <br />$20,230.89 <br />$3,538.79 <br />$807.94 <br />$34,253.84 <br />$25,895.79 <br />$49,789.13 <br />$95,143.85 <br />$121,619.23 <br />$59,378.09 <br />$21,038.83 <br />$22,396.18 <br />$560.80 <br />$212.82 <br />Rip Final Regraded Areas <br />RIPPER <br />10.66 <br />Grade Light -Use Roads <br />GRADER <br />1.21 <br />Regrade Access Road to Drill Pad #2 from Minor <br />Revision 18 <br />DOZER <br />0.41 <br />Finish Grade All Areas <br />GRADER <br />33.76 <br />Grade Valora Pit N/S Highwall <br />DOZER <br />62.94 <br />Grade Valora Pit E/W (Scraper Pit) Highwall <br />DOZER <br />7.80 <br />Grade Neck Pit Highwall <br />DOZER <br />1.78 <br />Regrade Pond 011 <br />DOZER <br />30.20 <br />Regrade Pond 012 <br />DOZER <br />96.23 <br />Regrade Pond 014 <br />DOZER <br />53.58 <br />Regrade Diversion 14A <br />GRADER <br />0.67 <br />Construct Post - Mining Drainage Channels <br />POSTMININ <br />G <br />544.97 <br />Regrade Pond I IA <br />DOZER <br />28.63 <br />Regrade Pond 12A <br />DOZER <br />44.72 <br />Grade Valora Pit N/S Spoil Ridges <br />DOZER <br />22.77 <br />Grade Valora Pit E/W (Scraper Pit) Spoil Ridges <br />DOZER <br />3.98 <br />Grade Neck Pit Spoil Ridges <br />DOZER <br />0.91 <br />Replace Topsoil from Stockpile A to Pond 010 <br />SCRAPERI <br />20.76 <br />Replace Topsoil from Stockpile B to Shop Area <br />SCRAPERI <br />15.70 <br />Replace Topsoil from Stockpile Haul Fill from to <br />Neck Pit <br />SCRAPERI <br />30.18 <br />Replace Topsoil from Stockpile I to Entrance Road <br />and Wadge <br />SCRAPERI <br />57.67 <br />Replace Topsoil from Stockpile L to Unreleased <br />Pond 12 Area <br />SCRAPERI <br />73.72 <br />Replace Topsoil from Stockpile P to Pond 13 Slide <br />Area <br />SCRAPERI <br />35.99 <br />Grade Remaining Valora Pit N/S Spoil Ridges <br />DOZER <br />23.68 <br />Grade Remaining Valora Pit E/W (Scraper Pit) <br />Spoil Ridges <br />DOZER <br />25.20 <br />Replace Topsoil from Stockpile to MR -18 Drill <br />Pads <br />DOZER <br />0.63 <br />Replace Topsoil from Stockpile to MR -18 Access <br />DOZER <br />0.24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.