My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-22_GENERAL DOCUMENTS - M1977342
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977342
>
2013-02-22_GENERAL DOCUMENTS - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:26 PM
Creation date
3/7/2013 3:28:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/22/2013
Doc Name
MEMO TO FILE - SPILL REPORTING
From
DRMS
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />Date: 2/22/13 <br />Specialist: PSH <br />Subject: Spill Report — Tailings Delivery Line Leak <br />Operator: Climax Molybdenum <br />Operation: Henderson Mill <br />File No.: M- 1977 -342 <br />Type of Interaction: Meeting <br />Mined Land Reclamation <br />MEMO TO FILE <br />STATE OF COLORADO <br />Other <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />Person(s) contacted and affiliation: - aynes, Climax Molybdenum — Henderson Operations <br />Summary and Resolution of Interaction: <br />As required by Rule 3.1.13 — Spill Reporting <br />Mr. Tim Haynes notified the Division of a spill of tailing slurry on February 21, 2013. The leak <br />was discovered at approximately 7:30AM on Friday 21, 2013. <br />Notice Requirements (3.1.13(2)): <br />(a) Climax Molybdenum, M- 1977 -342, Tim Haynes <br />(b) (303) 569 -3221 Ext. 22984 <br />(c) 4:33 PM, February 21, 2013 <br />(d) Tailing slurry <br />(e) An estimated 1,000 to 2,000 gallons of tailing slurry was released due to a joint <br />failure in the Reinforced Concrete Pipe delivery line. The released tailings did not <br />leave the permit area (or affected area), the released tailings flowed down the adjacent <br />road and returned into the 3 -Dam facility. <br />(f) Henderson employees wedged more packing into the void between the RCP pipes to <br />slow the release of tailing slurry. Tailings delivery was diverted to the #1 Cutout the <br />next day while failure was repaired. <br />Additional information: The Division will conduct an inspection of the spill on Tuesday <br />February 26, 2013. <br />Office of Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.