Laserfiche WebLink
Section B - Rule 4 <br />L Roads - Rule 4.03 <br />A. Haul Roads <br />1. The applicant has provided relevant information concerning the pre -1995 <br />constructed haul road at King I that shows the road meets the performance <br />standards of Rule 4.03.1. The applicant has provided a design of the haul road <br />for the King 11 Mine that indicates this road will meet the performance <br />standards of Rule 4.03.1. <br />2. The Division proposes to approve the retention of the haul road at the King I <br />Mine depicted on Map No. King I -007 because it is compatible with the <br />approved post- mining land use, and a request for its retention was submitted by <br />the landowner. (4.03.1(1)(f)(i)). <br />B. Access Roads <br />The landowner has requested the retention of the access /haul road at the King I <br />Mine. Its retention is compatible with the approved post- mining and historic land <br />use of agriculture (ranching). Therefore the Division proposes to approve retention <br />of the access road. (4.03.2(1)(f)). <br />C. Light -Use Roads <br />There are no light -use roads at the King Coal Mine. <br />IL Support Facilities - Rule 4.04 <br />Information on mine support facilities is found in Section 2.05.3 of the permit and is <br />depicted on Maps King I -007 and King II -007. The landowner has requested in writing <br />that some of the buildings at the King I Mine remain after reclamation to support his <br />agriculture operation. A summary is found in the Summary Section of this document <br />under 'Description of Operations and Reclamation Plan ". Mine support facilities have <br />been designed to prevent damage to fish, wildlife, and property, and to control and <br />minimize air and water pollution; therefore, the Division proposes to approve the proposed <br />construction of facilities. No support facilities are proposed for permanent retention at the <br />King II Mine. <br />Construction of support facilities will not result in damage, destruction, disruption of oil, <br />gas, or water wells or pipelines, or utility lines which may pass through the permit area. <br />Therefore the Division proposes to approve those activities (4.04(6)). <br />14 <br />