Laserfiche WebLink
-...,.. — _ -- -- „— <br />Site <br />Biosol (7-2-3) <br />N <br />P <br />K <br />15% <br />Lbs /Acre <br />Lbs /Acre <br />Lbs /Acre <br />Lbs /Acre <br />Pit #1 SW Corner <br />500 <br />0 <br />200 <br />0 <br />Pit #2 SE Corner <br />1000 <br />0 <br />200 <br />0 <br />Pit #2 North Corner <br />1000 <br />0 <br />200 <br />0 <br />Pit#3 North Outer <br />1000 <br />0 <br />200 <br />0 <br />Pit#4 West Middle <br />500 <br />0 <br />200 <br />0 <br />Blackwell Switchgrass <br />25% <br />Elida or Woodward Sand Bluestem <br />25% <br />Llano or Cheyenne Indiangrass <br />15% <br />Goshen Prairie Sandreed <br />15% <br />Paloma Indian Ricegrass <br />10% <br />Sand Dropseed <br />10% <br />Blackwell Switchgrass <br />25% <br />Elida Sand Bluestem <br />25% <br />Llano Indiangrass <br />25% <br />- -Sand Dropseed <br />25% <br />LLC <br />Introduction <br />This report is designed to provide an overview of the reclamation practices that were <br />implemented by Habitat Construction, LLC in conjunction with Habitat Management, Inc. and <br />the NRCS. <br />Reclamation Assessment <br />Habitat Management was contracted to conduct a reclamation assessment of the project when <br />seeding recommendations from the construction plans were deemed inadequate. Habitat <br />Management's recommendations are based on documentation provided by the OWNER (Thomas <br />Brubaker) and the NRCS. Recommendations from the NRCS are listed in Table 1 and the <br />specification (Exhibit E) recommendations are listed in Table 2. <br />Table 1: MR CS Recommendation <br />• <br />: Exhibit E <br />These recommendations were based on the assumption of sandy soils (i.e. Deep Sands, Sandy <br />Bottomland, and Sandy Plains ecosites). <br />Habitat Construction, LLC then took the extra precaution of having a soil analysis to be sure of <br />exact soil conditions of the project site. Soils samples (Appendix A) were taken from various <br />locations around the project site then delivered to Colorado Analytical Laboratories, Inc. It <br />was noted in the reports that the field samples were that of sandy soils. <br />Reclamation <br />Pre - reclamation soil stabilization practices that were implemented by Habitat Construction, LLC <br />included silt fence installation around the construction activity perimeter, erosion matting placed <br />around the riprap outfall and dozer tracking slopes with erosion potential. <br />Habitat Construction, LLC met with Robin Bay of Habitat Management, Inc. on March 26 to <br />discuss reclamation practices, seed mixes and site specific reclamation techniques that were to be <br />implemented on the project. After a thorough site assessment, the following tables list the final <br />decision of reclamation fertilizer and seed mix. <br />An Equal Opportunity Employer <br />Valco Pits Reclamation <br />Project No: 11 -049 <br />200 S 17th Street • PO Box 550 • Rocky Ford, CO • Office: (719) 254-3900 • Fax (719) 254-3901 <br />