My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-06_REPORT - M1977572
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977572
>
2013-03-06_REPORT - M1977572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:50:29 PM
Creation date
3/7/2013 7:29:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977572
IBM Index Class Name
REPORT
Doc Date
3/6/2013
From
Valco, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total acres <br />backfilled: <br />4 q 3 <br />Total acres <br />seeded w/ <br />approved mix: <br />4- . <br />Total acres <br />w /topsoil <br />replaced: <br />e� <br />, _ j <br />�'" , <br />Total acres <br />mulched w/ <br />approved mulch: <br />Prowers <br />Total acres <br />graded: <br />9 7 <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />4 Z <br />Topsoil <br />replacement <br />depth (in.): <br />,-- <br />Mulch application <br />rate (tons /ac): <br />— <br />Seed <br />application <br />method: <br />5e <br />A ��wa G� <br />Fertilizer <br />application <br />method: <br />.6¢42- <br />L ek <br />�' k u o" <br />Mulch <br />application <br />method: <br />S e-e Cd-'� �aC <br />Permittee Name: <br />Valco Inc. <br />Permit Number: <br />M- 1977 -572 <br />Operation Name: <br />Lamar East Pit <br />County: <br />Prowers <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />March 22, 2013 <br />Permit Acreage: <br />72.20 <br />Current Bond Amt: <br />$ ft J 4/0, 000 ,o O <br />74 1- • <br />112c Annual e port <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). . NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />Op- itispepFio - to 26 - Z 0 (Z ('¢cla - Om- CD014 elecatf r.e✓tge`f4 E ; C M . <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />'ECE <br />DIVISION off <br />11. Estimated acres to be reclaimed in the next report year. �IAfl�y <br />12. Total acres in various stages of reclamation, since permitted mining activities began: ETY <br />( 4 . 4 - t - o . o - L e c i k e L A 4 :4- C o cc 54 v v 4.-4' t! B w <br />q- 30-ZoI7 <br />YES <br />YES <br />YES <br />age 2 of 3 <br />MAR n 2 013 -B- <br />
The URL can be used to link to this page
Your browser does not support the video tag.