My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-06_HYDROLOGY - M1977572
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977572
>
2013-03-06_HYDROLOGY - M1977572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:14:32 PM
Creation date
3/7/2013 7:28:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977572
IBM Index Class Name
HYDROLOGY
Doc Date
3/6/2013
Doc Name
Stormwater Annual Report
From
Valco, Inc.
To
CDPHE-WQCD and DRMS
Permit Index Doc Type
Hydrology Report
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 471'0' RMWATER ANNUAL REPORT - SAND AND GRAVEL i 11- !� 7 ' ? COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT R E C+ E I v <br />Water Quality Control Division E <br />WQCD-P-B2 ' IiAR � � 2013 �o�l <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246 -1530 <br />� � NOA�p gApE�i <br />Make enough copies of form for each reporting year. Or g o to <br />�eCg if this is a <br />http: //www. cdphe. state. co. u q PermitsUrdt /stotmwater /industri'al. html new name, address, etc. <br />Permittee (Company Name): <br />f. <br />V p- t i p 14. . <br />Facility Name: t- d- <br />Mailing Address: ( <br />Facility Phone Number: <br />Permit Certification No. COR 34 <br />Reporting Period: Jan. 1 -Dec. 31, 20 J Z.- (Form is due by Feb. 15 of the following year) <br />* *Each section must be completed. Please print or type. ** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures <br />Management Plan (SWMP), to fly implement it, changes or <br />taken to comply with your Stormwater Manag training, spills, other <br />improvements made in any of your Best Management Practices (BMPs), employee <br />problems encountered, etc. How is your plan working ?) <br />Were changes made to your SWMP? v No <br />ection made, including .�.� fiy�tnPS and action <br />B. A summary of each comprehensive stormwater facility insp bons per year - see Page 8 of the <br />taken. (The permit requires at least two comprehensive facility inspec <br />permit. Include here a summary of those inspections, plus any other comprehensive inspections made_ It is <br />not necessary to <br />summarize day-to-day inspections, unless significant problems were noted.) <br />/Lee e <br />Note - form may be reproduced Page 1 of 2 <br />First Inspection - Date 2/ If/ i Z: Findings, and action taken: <br />(1 e c-v o e . ? eLeA <br />Yes - Describe changes on a separate sheet. <br />Let. <br />09/07dj <br />
The URL can be used to link to this page
Your browser does not support the video tag.