My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-28_REPORT - M1979045
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1979045
>
2013-02-28_REPORT - M1979045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:50:30 PM
Creation date
3/5/2013 8:55:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
REPORT
Doc Date
2/28/2013
From
The Lakewood Brick and Tile Company
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date: <br />Additional information <br />Lakewood Brick and Tile Co. <br />M- 1979 -045 <br />Church Pit <br />02/28/2013 <br />7. Total Disturbance 67.50 ac ± <br />Clay Approximately 40.30 acres is disturbed by the clay operation <br />in Stages 0, I and II. This included the old clay mined <br />area south of the ditches shown as the Clay Processing Plant <br />area (purple) and the active clay mining area north of the <br />ditches (light blue). <br />Gravel Approximately 27.20 acres is disturbed, 12.75 acres is being <br />used as plant site area in Stage A (orange) and the remain- <br />ing 15.00 acres is stockpile area. No gravel was mined this <br />year. The material processed at the Plant Site came from <br />gravel mined this year on the Rocky Flats Pit (M- 1987 -113). <br />Some waste rock was removed for use by the mineral owners <br />from the pre -law stockpile areas. <br />8. Clay No new area was disturbed this year as we continue to mine <br />the area stripped in previous years. Mining will continue <br />in Stage I or Stage II by mining deeper into the clay veins <br />exposed in the past and advance the face to the north as <br />needed. Stripping will continue over the clay deposit to <br />expose additional clay in the area north of the ditches. <br />The stockpiled clay on the east side of Stage II is being <br />removed on a regular basis (tan). It is blended with the <br />clay from this mine at our brick plant in Lakewood. <br />Gravel Mining will continue to removed material between the Church <br />Pit and the Rocky Flats Pit as approved in the permit. No <br />sloping will be required along the permit boundaries on the <br />east side of this mine. <br />9. No reclamation was required this year. The Pre -law stockpile areas <br />that were disturbed have been graded so only resoiling and seeding <br />will be needed when it is time for those areas to be seeded. <br />Additional backfilling was done on the north side of Stage 0 (green) <br />to facilitate relocation of the northern haul road. Stockpiles of <br />growth medium are located along the west and south sides of the <br />permit area (pink). <br />11. No reclamation is called for during the next year. However, <br />backfilling may continue in the old clay pit area. The waste <br />material from gravel processing will be used to construct the south <br />mine slope from the original ground level to the pit floor. We will <br />continue to fill the north slope of the old clay pit and begin to <br />do sloping on the east side of Stage A if the gravel operator <br />removes the overburden pile next to the face on that side. If the <br />opportunities to sell rock from the pre -law overburden piles occur, <br />that removal will continue as well. <br />12. Approximately 3.55 acres on the south section of the old clay mine <br />has been backfilled over the life of the mine. The filled area is <br />graded and used for working area in the Clay and Gravel Plant sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.