Laserfiche WebLink
C <br />n or <br />RECLAMATION <br />MINTING <br />SAFETY <br />RE Ge °61) <br />COAL MINING PERMIT - TECHNICAL REVISION DECISION <br />MA R p 4 V Bowie No. 2 Mine, Bowie Resources, LLC <br />�, Permit No. C -1996 -083 <br />,01,0on of & <br />The En of Reclamation, Mining and Safety has proposed the decision stated below. Provided there <br />are no objections, the decision will become effective upon the termination of the ten (10) day public <br />comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br />Technical Revision No. 75 Decision: Approve with conditions <br />Submittal Date: September 13, 2012 Decision Date: February 11, 2013 <br />Description of Revision: Incorporate as-built configuration and volume for gob pile #4 into permit <br />document. <br />REVISED INFORMATION <br />APPLICATION PAGES <br />Volume IX: Engineer's Certification cover page, <br />page 4, and Stability Analysis. <br />DELETED ITEMS <br />CHANGE IN <br />ACREAGE <br />Disturbed: 0.00 <br />Affected: 0.00 <br />Permit: 0.00 <br />State: 0.00 <br />Federal: 0.00 <br />Private: 0.00 <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />REVISED <br />TOTAL ACREAGE <br />Disturbed: <br />Affected: <br />Permit: <br />State: <br />Federal: <br />Private: <br />362.70 <br />5,176.20 <br />8,300.50 <br />0.00 <br />3,663.60 <br />4,636.90 <br />Stipulation(s) attached; Provide authorized signature and return the form to the Division. <br />DIVISION OF RECLAMATION, MINING & SAFETY <br />Authorized Representative <br />Date: 2/11/2013 <br />MAPS/EXHIBITS <br />None <br />PERFORMANCE BOND <br />Prior Liability: <br />Change in Liability: <br />Revised Liability <br />Bond Held <br />PERMITTEE <br />Authorized Representative <br />Date: /- /3 <br />$9,510,518.03 <br />$0.00 <br />$9,510,518.03 <br />$9,510,519.03 <br />