Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />- MINING OPERATIONS - <br />I. PROCESSING <br />Will processing (i.e., crushing, screening, etc.) occur on site? NO <br />NO"T"E: ALLL, PROCESS EQUIPMENT REQUIRES A SEPARA'T'E, PERMIT <br />APPLICATION AND ADEN. <br />PRIMARY CRUSHING <br />Maximum tons crushed per year: N/A <br />Maximum tons crushed per hour: <br />Hours of crushing per day: <br />Proposed Controls: <br />❑ Moist Material <br />• Water Spray <br />• Enclosure Type: <br />• Other (specify) <br />SECONDARY CRUSHING <br />Maximum tons crushed per year: N/A <br />Maximum tons crushed per hour: <br />Hours of crushing per day: <br />Proposed Controls: <br />❑ Moist Material <br />❑ Water Spray <br />❑ Enclosure Type: <br />❑ Other (specify) <br />SCREENING /CLASSIFYING <br />Tons Maximum tons screened per year: N/A Tons <br />Tons Maximum tons screened per hour: Tons <br />Hours of screening per day. <br />Proposed Controls: <br />❑ Moist Material <br />• Water Spray <br />• Enclosure Type: <br />• Other (specify) <br />Tons <br />Tons <br />RESCREENING /CLASSIFYING <br />Maximum tons screened per year: N/A Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />❑ Moist Material <br />• Water Spray <br />• Enclosure Type: <br />• Other (specify) <br />J. CONVEYORS/TRANSFER POINTS <br />Tons Of Material Conveyed Per Year <br />Tons Of Material Conveyed Per Day <br />Proposed Controls <br />• Enclosure Type: <br />• Other (specify) <br />Number Of Transfer Points: <br />Proposed Controls <br />❑ Enclosure Type: <br />❑ Water Spray <br />❑ Chemical Stabilizer <br />❑ Other (specify) <br />N/A <br />(Indicate On A Separate Diagram How Conveyor System Is Set Up) <br />El <br />Tons. <br />Tons. <br />(Complete or Partial) <br />(Complete or Partial) <br />