My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-27_HYDROLOGY - M2001085
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2013-02-27_HYDROLOGY - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:36 PM
Creation date
2/28/2013 6:55:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
HYDROLOGY
Doc Date
2/27/2013
Doc Name
Complete Appl. for Cert. of Designation, Henderson Inert Landfill.
From
CDPHE
To
120 85 LLC and DRMS
Permit Index Doc Type
Hydrology Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 22, 2013 <br />Mr. Eric B. Fenster, Esquire <br />Completeness Review Determination: Complete — Application for Certificate of Designation, Henderson Inert Landfill, <br />Adams County, Colorado <br />Page 5 <br />13. For Section 11.1 (Closure Financial Assurance), Section 12 (Post - Closure Financial Assurance), <br />and Attachment 7 (Henderson Inert Landfill Closure and Post - Closure Cost Estimates) of the Plan <br />(Tarry 2012), pursuant to the requirements of Section 1.8.1 of the Solid Waste Regulations, closure <br />and post - closure cost estimates shall reflect the cost of hiring a third party to perform the closure <br />and post - closure care activities. Please verify that the costs provided reflect the cost of hiring a <br />third party to perform the closure and post - closure care activities. <br />In addition to complying with the Division's Solid Waste Regulations, 120 85 LLC must comply with all <br />relevant federal, state, and local regulations, including but not limited to, the requirements of DRMS, the <br />Division of Water Resources, the Water Quality Control Division, and the Air Pollution Control Division. <br />120 85 LLC is entitled to two meetings with the Division that are non - billable for this project. These <br />meetings can occur any time during the submittal and review process. The Division strongly encourages <br />you to contact the undersigned to arrange for and take advantage of these meetings. The Division has had <br />great success working with applicants during these meetings, which typically result in expedited reviews <br />and more effective communication. <br />The Division is authorized to bill for its review of technical submittals at $125 per hour, pursuant to <br />Section 1.7 of the Solid Waste Regulations. The fee ceiling is $35,000 for the review of your Application, <br />which includes time for the completeness review, the technical evaluation, associated meetings, other <br />communications, and any other related items to the Application. An invoice for the Division's review of <br />the subject document will be sent under separate cover. <br />Enclosed is a 30 -Hour Billable Time Notification Waiver /Cease -Work Notice. Please check the <br />appropriate box on this notice and sign and date the waiver. This notice should be returned to <br />Doug Eagleton at <br />HMWMD -B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246 -1530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.