My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-26_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2013-02-26_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:34 PM
Creation date
2/27/2013 8:42:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
2/26/2013
Doc Name
Completed AVS Check Request
From
Mary Rodriguez
To
Jason Musick
Type & Sequence
PR9
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AVS CHECK REQUEST <br />Permit No.: C-1982-056 Mine Name: Foidel Creek Mine Permit Action: PR-9 <br />Applicant: Twentymile Coal, LLC. MSHA ID #: Specialist: JDM <br /> <br />ADEQUACY <br />Request Date 9/25/2012 Attach a current list of the owners and controllers for the applicant and the operators, as required by Rule 2.03.4, Identification of Interests. <br /> <br />If applicable, attach a list of permits held by the applicant in other states, by numbers and state codes. <br />Date of Check 9/26/2012 <br />Application Yes No AVS Check Result: Please refer to e-mail with copy of changes needed and violation information. <br />Adequate? <br /> X <br />2 ND ADEQUACY, IF APPLICABLE <br />Request Date 2/26/2013 Attach any updated information. <br />Date of Check 2/27/2013 <br />Application Yes No AVS Check Result: The ownership and control information is consistent with the information in AVS. There are <br />Adequate? no violations listed. <br />X <br />3 RD ADEQUACY, IF APPLICABLE <br />Date of Check Attach any updated information. <br />Application Yes No AVS Check Result: <br />Adequate? <br /> <br />PROPOSED DECISION – REQUEST 3-5 DAYS PRIOR <br />Request Date <br />Date of Check AVS Check Result: <br />PERMIT ISSUANCE – REQUEST 3-5 DAYS PRIOR <br />Request Date Ownership and Control Information Current, per Rule 2.03.4(5)? Yes No, revised information is attached <br /> <br />Date of Check <br />Permit Application and Yes No, Revision Required AVS Check Result: <br />AVS Consistent? <br /> <br />DECISION FINAL <br />Date Final: <br />Date Entered in AVS: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.