My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-04_REVISION - M2001085
>
Day Forward
>
Revision
>
Minerals
>
M2001085
>
2013-02-04_REVISION - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:20 PM
Creation date
2/26/2013 5:00:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
REVISION
Doc Date
2/4/2013
Doc Name
ADEQUACY COMMENTS
From
DRMS
To
OPERATOR
Type & Sequence
AM6
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.5 Exhibit E- Reclamation Plan <br />�.. .t <br />1) The proposed Reclamation for the site is to change it from the previously approved clay. <br />lined water storage to a backfilled pit to two feet above the historical ground water level. <br />The op erator proposes to accomplish this.task by importing inert- fill as,part ofithe baekfill. <br />Please-describe ho'w•the , ReclamatioyrPlan.will beimplementecbfo;meet each application of. <br />requirements of Sectionf3 :1.5. •(.1),;(3)1andi(4). ; ?: s . .lei;,, a , ,„ r„ <br />2) In accordance With Rule 6.4,5',(2)(f), provide- a brief description of (i) Final Grading = <br />specify maximum anticipated slope gradient;(ii) , Seeding;(iii) Fertilization:if applicable; and <br />(v) Topsoiling <br />6.4.6 Exhibit F- Reclamation Plan Map <br />6.4.7 Exhibit G - Water Information <br />{ - _ <br />1) Please provide a reclamation plan map in accordance with Rule 6.4.6 (a) and (b-) Cc <br />• I <br />1) Please provide proof that the operator has the appropriate water substitute or <br />augmentation plan approved by the State Engineer's office for evaporative,1oss from a <br />ground water source, until the pit is backfilled to two feet above the historical ground water <br />level. You stated under the Exhibit that your current approved water plan will expire on <br />10/31/12. <br />6.4.12 Exhibit L Reclamation Cost <br />1) Under the reclamation cost you provided a total cost of $41,900.00. The cost includes a re- <br />vegetation cost of $24,500.00 and $17,400.00 to replace or backfill with clean inert fill. <br />However under Exhibit "E ", reclamation cost you estimated a total of 243,000 cubic yards of <br />inert material that will be needed to back fill the pit to two feet above the historical ground <br />water level. The Division will adjust this cost and send you a detailed reclamation warranty <br />calculation to reflect the actual cost and indirect cost based on the volumes and reclamation <br />plan you provided. <br />6.4.19 Exhibit S Permanent Man - made Structures <br />(a) Where the mining operation will adversely affect the stability of any significant, <br />valuable and permanent man -made structures located within two hundred (200) feet of <br />the affected land, the applicant may either provide a notarized compensation agreement <br />or an engineering study to show the proposed reclamation plan will not adversely affect <br />any manmade structures within 200feet of the proposed reclamation plan. Under the <br />pervious amendments there are 10 items listed as permanent structures within 200 feet <br />of the affected land. Are the agreements reached under the previous plan for these <br />structures still valid? Please explain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.