Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />E. Iii . ment <br />0.17 <br />0.17 <br />• <br />0.17 <br />0.17 <br />0.00 <br />NA <br />0.00 <br />NA <br />• <br />0.33 <br />• <br />0.33 <br />Mobilization Worksheet Cont'd Task # 004 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: HANOEVER <br />Total one -way travel distance: 5.00 miles <br />Average Travel Speed: 30.00' mph <br />• <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading 'Tin (Hours): <br />Unloading Time ( Hou <br />Subtotals: <br />'JOB TIME AND COST <br />• <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />$604.94 <br />ra.q <br />• <br />$0.00 -" <br />Total job time: 0.67 Hours <br />Total job cost: $604.94 <br />CLRCES Cost Estimating Software <br />