Laserfiche WebLink
Midterm Review <br />Peabody Sage Creek Mine <br />C- 2009 -087 <br />This document presents the results of the Midterm Permit Review of the Peabody Sage Creek <br />Mining, LLC.'s (PSCM) Peabody Sage Creek Mine. The Colorado Division of Reclamation, <br />Mining and Safety (Division) conducted this review for the purpose of fulfilling the requirements <br />of the Colorado Surface Coal Mining Reclamation Act and the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining. <br />This Midterm Review was conducted to fulfill the requirements of Sections 2.08.3, 2.06.2(10), <br />2.06.3(4)(a), 2.06.5(3), 2.06.7(5) and 3.02.2(4). <br />Section 2.08.3 of the Regulations requires that the Division conduct a review of each permit <br />issued, prior to its midterm. Based on this review, for good cause shown, the Division may <br />require reasonable revisions or modifications of the permit provisions to ensure compliance with <br />the Act and Regulation. <br />Section 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br />acceptance of the bond every 2 '/z years. <br />Sections 2.06.2(10), 2.06.3(4)(a), 2.06.5(3) and 2.06.7(5) require that experimental practices, <br />mountaintop removal variances, variances from approximate original contour (AOC) for steep <br />slope mining and variances from contemporaneous reclamation for combined surface and <br />underground mining, respectively, be reviewed by the Division where applicable during the <br />Midterm Review. Of these, the Foidel Creek Mine permit includes variances from <br />contemporaneous reclamation for combined surface (a historic surface mining operation, <br />Colorado Yampa Coal Company Permit C- 1981 -071, incorporated into the permit) and (current) <br />underground operations. <br />This Midterm Review consisted of a detailed review of the following document: <br />• The Peabody Sage Creek Mine permit application, including stipulations and responses <br />• All revisions made to the permit since the issuance of the permit <br />• The Peabody Sage Creek Mine annual reclamation and hydrology reports <br />• Bond surety and reclamation cost estimate <br />• The Division findings document <br />• The Division's inspection reports <br />• Any notices of violations since the issuance of the permit <br />Peabody Sage Creek Mine -2- 2/20/2013 <br />