My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-25_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2013-02-25_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:32 PM
Creation date
2/25/2013 11:20:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
2/25/2013
Doc Name
Midterm Review
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
MT1
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 of 129 <br />Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 <br />365.00 <br />- 2.60 <br />3.00 <br />0.40 <br />4254 <br />0.622 <br />2 <br />525.00 <br />-8.69 <br />3.00 <br />-5.69 <br />1693 <br />0.437 <br />3 <br />1760.00 <br />-6.25 <br />3.00 <br />-3.25 <br />3053 <br />0.642 <br />4 <br />900.00 <br />- 5.30 <br />3.00 <br />-2.30 <br />3893 <br />0.286 <br />Haul Time: 1.987 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 <br />900.00 <br />5.30 <br />3.00 <br />8.30 <br />2120 <br />0.555 <br />2 <br />1760.00 <br />6.25 <br />3.00 <br />9.25 <br />2000 <br />0.878 <br />3 <br />525.00 <br />8.69 <br />3.00 <br />11.69 <br />1477 <br />0.321 <br />4 <br />365.00 <br />2.60 <br />3.00 <br />5.60 <br />2851 <br />0.277 <br />Loading Tool unit <br />Production <br />Truck Unit Production <br />Optimal No. of Trucks <br />229.72 <br />4 <br />Return Time: <br />Total Truck Cycle Time: <br />2.031 <br />6.668 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 762.68 <br />Adjusted single truck/loader team production: 762.68 <br />Adjusted multiple truck/loader team production: 762.68 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.228 /LCY <br />minutes <br />minutes <br />770.54 LCY/Hour <br />190.67 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 63.46 Hours <br />Total job cost: $107,821.90 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.