Laserfiche WebLink
12. Prima future (Post - mining) land u se (check onel: ^ <br />Cropland(CR) I I Pastureland(PL) <br />El Rangeland(RL) n Forestry(FR) <br />n Residential(RS) 1 Recreation(RC) <br />n Developed Water Resources(WR) <br />13. Primary present land use (check one <br />Ill Cropland(CR) Pastureland(PL) <br />.1 Rangeland(RL) Forestry(FR) <br />Residential(RS) J1 Recreation(RC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Track hoe, dozer and loader loading surface gravel into trucks or directly into sluice, then some gravel to crusher /screen plant. <br />15. On Site Processing: <br />16. Description of Amendment or Conversion: <br />Crushing/Screening <br />- 4 - <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Dozer may push gravel down td loader or tgr hoe which will load gravel directly into trucks which will haul the matenal to the gold plant. <br />Some gravel will go to Crush /Screen plant for sizing and sale. Overburden may be excavated and loaded directly into previous cut. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The 2013 Amendment incorporates additional land for expanded mining operation and also <br />allows area for dead tree storage for chipping to make mulch for final reclamation. <br />