My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-22_REVISION - M1984094 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984094
>
2013-02-22_REVISION - M1984094 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:13:10 PM
Creation date
2/22/2013 2:45:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984094
IBM Index Class Name
REVISION
Doc Date
2/22/2013
Doc Name
AM-02 SUBMITTAL
From
OPERATOR
To
DRMS
Type & Sequence
AM2
Email Name
MAC
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task # <br />Description <br />Time Needed <br />in months <br />1 <br />Strip Initial overburden from Cut 1 of Area 1 and place in <br />previous pit. Excavate ramp into pit. <br />1.0 <br />2 <br />Start in Mine Area 1. Send gold bearing gravel to process- <br />ing plant. <br />1.5 <br />3 <br />Finish Mine Area 1. Send gold bearing gravel to process- <br />ing plant. Place overburden in first Cut. <br />24.0 <br />4 <br />Mine Area 2. Do concurrent reclamation. <br />24.0 <br />5 <br />Mine Area 3. Send gold bearing gravel to processing plant. <br />Do concurrent reclamation. <br />28.0 <br />6 <br />Regrade site and sell remaining gravel stockpiles. <br />2.5 <br />7 <br />Remove all equipment from site. <br />0.5 <br />8 <br />Place substitute topsoil on regraded areas. <br />1.5 <br />9 <br />Place topsoil on prepared areas <br />1.0 <br />10 <br />Seed, mulch and place tree saplings in remaining reclaimed <br />area <br />1.0 <br />TOTAL <br />85.0 <br />The mining timetable for the gold operation is given below: <br />Mining Timetable - Gold Operation <br />Since the operation will only be active for 6 -8 months per year, 7 months will be the assumed aver- <br />age, therefore, the full gold mining operation will take approximately 11 -12 years. <br />Gloria Z Mine 2013 Amendment 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.