My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-22_REVISION - M1984094 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984094
>
2013-02-22_REVISION - M1984094 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:13:10 PM
Creation date
2/22/2013 2:45:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984094
IBM Index Class Name
REVISION
Doc Date
2/22/2013
Doc Name
AM-02 SUBMITTAL
From
OPERATOR
To
DRMS
Type & Sequence
AM2
Email Name
MAC
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on the site observations and discussing performance with the operators on site, Mr. Lewicki <br />concluded that highwalls could be included in the mining operation as long as site personnel were <br />observant for any cracks, mud zones, gravel zones without cementing fines, slips, or any other <br />signs of instability. No highwall should exceed MSHA requirements and any signs of instability <br />must be addressed immediately through backfilling or other means. All newly constructed <br />highwall slopes should not exceed 80 degrees from horizontal. Depths above 60 feet vertically <br />may require benching. <br />It appears that there is a zone of some gold in the gravel from the surface to a depth of approxi- <br />mately 20 -30 feet, followed by a barren gravel zone of 30 -40 feet followed by a zone of up to 25 <br />feet that contains a higher percentage of gold. The barren zone will be used to backfill previous <br />pits and the other material will be sent to the plant for processing. Some of the washed gravel will <br />also be used for backfilling and other material may be further crushed and screened for gravel <br />product sale. <br />Once the initial pits have been excavated, barren material and washed gravel will be used to back- <br />fill previous pits. The maximum amount of pit that requires backfilling will be limited to 20,000 <br />cubic yards. <br />A current highwall (start of 2013) of approximately 60 feet height will be implemented at the <br />south end of the infiltration pond. This pond will later become the settling pond for the processing <br />plant and the highwall will eventually be filled in from the ongoing processing. It is, however, <br />understood that the highwall must be bonded for the worst case, which is the current condition. <br />This current highwall at the infiltration pond will require 12,000 cubic yards to backfill to the ac- <br />cepted post -mine land use of rangeland. A swale may be left in the landscape but no slope will be <br />steeper than 4H:1 V. <br />Gloria Z Mine 2013 Amendment 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.