Laserfiche WebLink
��i'R » °" COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />I1111AMATICIN <br />MINING fy 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />,AFETY <br />EXTENSION OF TIME FOR ABATEMENT NOTICE <br />FOR NOTI CE OF VI OLATI ON OR CESSATI ON ORDER FOR COAL OPERATI ON <br />TO: THE OPERATOR AND PERM ITTEE OF THE MINE DESCRIBED BELOW <br />Cessati on <br />NA <br />Order No. <br />Date NOV or <br />January 14, 2013 <br />CO Issued: <br />Mine: <br />Bowie No. 2 Mine <br />Operator (If <br />Same <br />Other than <br />Per mi ttee): <br />M ai I Address: <br />Same <br />Notice of <br />Violation No. <br />Permit No.: <br />CV- 2013 -001 <br />C1996083 <br />County: Delta <br />Type of M i ne: Underground/ Federal <br />Permittee: Bowie Resouroes, LLC <br />Mail Address: Mr. William A. Bear <br />P.O. Box 483 <br />Paonia CO 81428 <br />In Notice of Violation No. CV- 2013 -001, the deadline for abatement of the practice, condition or <br />violation described was fixed at February 12, 2013. <br />It i s hereby found that the operator has fad I ed to abate such practi ce, condi ti on or vi of ati on, or <br />cannot comp) ete abatement wi thi n the ti me al I owed, but that such fai I ure i s not due to I ack of <br />di I i gence on the part of the operator. The ti me for abatement i s therefore extended to February 27, <br />2013. <br />The conditions, practices or violation as to which this extension applies areas follows: <br />Failure to save topsoil and subsoils before disturbance of areas affected by surface coal mining <br />operations, as required by Rule 4.06.1(1). Abatement Step 3, " Save al I topsoil in accordance with <br />Rule 4.06.2." has been extended to February 27, 2013, due to ground conditions and equipment <br />issues on site. <br />DIVISION OF RECLAMATION, MININGAND SAFETY <br />Date of Issue: February 4, 2013 <br />By: <br />(signature of Authorized Representative) <br />Susan L. Burgmaier, <br />Environmental Protection Specialist <br />[Signature of Division Director, if extension is beyond 90 days, <br />pursuant to Rule 5.03.2(2)(e)]. The Divi don's justification for <br />approvi ng the extend on beyond 90 days i s attached. <br />