My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-04_ENFORCEMENT - C1996083 (2)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1996083
>
2013-02-04_ENFORCEMENT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:47 PM
Creation date
2/22/2013 1:32:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Enforcement
Doc Date
2/4/2013
Doc Name
Request for Civil Penalty Assessment (Emailed)
From
Susan Burgmaier
To
Daniel Hernandez
Violation No.
CV2013001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
salvage in the MR -132 and TR -72 approved disturbance areas. And, it was not <br />determined until construction began that topsoil salvage would not be possible. As <br />part of the TR -76 package, the operator has requested a variance for topsoil salvage in <br />the area around the gob pile #2 expansion. If topsoil is available, Bowie will salvage it, <br />however, if the area is too steep, to rocky, or topsoil is too thin, no topsoil will be <br />salvaged. This variance request is included as part of the TR -76 approval on January <br />14, 2013. <br />Bowie did not willfully violate the terms of the permit, and hopes the above explanation <br />will provide justification as to why the events occurred. <br />
The URL can be used to link to this page
Your browser does not support the video tag.