Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 65 of 299 <br /> <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 0.903 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 1.150 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.7757 <br /> <br />Adjusted unit production: 733.81 LCY/hr <br />Adjusted fleet production: 2935.24 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) Unit cost: $0.436/LCY <br /> <br />Total job time: 68.14 Hours Total job cost: $87,196.19 <br /> <br />