Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 63 of 299 <br /> <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade (%) Roll. Res (%) Total Res (%) Velocity (fpm) <br />Travel Time (min) 1 5280.00 10.00 5.00 15.00 734 7.199 Haul Time: 7.199 minutes <br />Return Route: Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) 1 5280.00 -10.00 5.00 -5.00 2938 1.853 Return Time: 1.853 minutes <br />Total Truck Cycle Time: 12.142 minutes Loading Tool unit Production 318.08 LCY/Hour Adjusted for job efficiency: 264.01 LCY/Hour <br />Truck Unit Production <br />57.37 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />47.62 <br /> <br />LCY/Hour <br />Optimal No. of Trucks: <br /> <br />6 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />4 <br /> <br />Truck(s) Adjusted hourly truck team production: 190.47 LCY/Hour <br />Adjusted single truck/loader team production: 190.47 LCY/Hour <br />Adjusted multiple truck/loader team production: 190.47 LCY/Hour JOB TIME AND COST Fleet size: 1 Team(s) Total job time: 10.50 Hours <br /> Unit cost: $2.125 /LCY Total job cost: $4,249.97 <br />