My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-17_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-01-17_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:11 PM
Creation date
2/22/2013 1:23:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/17/2013
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Jim Stover
Type & Sequence
RN3
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 51 of 299 <br /> <br /> <br />Cycle Time: Scraper Loading Time: 0.90 Minutes <br />Maneuver and Spread Time: 0.60 Minutes Job Condition Correction: Site Altitude: 6750 feet Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA Travel Time: Road Condition: Rutted dirt, little maintenance, no water, 2” tire penetration 5.0 Haul Route: <br />Seg # Haul Distance (Ft) Grade (%) Roll. Res (%) Total Res (%) Velocity (fpm) Travel Time (min) <br />1 1000.00 -15.00 5.00 -10.00 1749 0.69 Haul Time: 0.69 minutes Return Route: <br />Seg # Haul Distance (Ft) Grade (%) Roll. Res (%) Total Res (%) Velocity (fpm) Travel Time (min) <br />1 1000.00 15.00 5.00 20.00 868 1.17 Return Time: 1.17 minutes Total Scraper team cycle time: 3.36 minutes <br />Adjusted for job conditions: 539.70 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 539.70 LCY/Hour Adjusted multiple scraper team (fleet) hourly production: 539.70 LCY/Hour Unadjusted unit production/hour: 650.25 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST Fleet size: 1 Team(s) Total job time: 1.51 Hours <br /> Unit cost: $1.032 /LCY Total job cost: $841.42 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.