Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 35 of 299 <br /> <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade (%) Roll. Res (%) Total Res (%) Velocity (fpm) <br />Travel Time (min) 1 600.00 0.00 3.00 3.00 2983 0.764 Haul Time: 0.764 minutes <br />Return Route: Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) 1 600.00 0.00 3.00 3.00 3569 0.381 Return Time: 0.381 minutes <br />Total Truck Cycle Time: 5.145 minutes Loading Tool unit Production 832.76 LCY/Hour Adjusted for job efficiency: 691.19 LCY/Hour <br />Truck Unit Production <br />469.39 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />389.59 <br /> <br />LCY/Hour <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) Adjusted hourly truck team production: 779.18 LCY/Hour <br />Adjusted single truck/loader team production: 691.19 LCY/Hour <br />Adjusted multiple truck/loader team production: 691.19 LCY/Hour JOB TIME AND COST Fleet size: 1 Team(s) Total job time: 89.33 Hours <br /> Unit cost: $0.936 /LCY Total job cost: $57,762.63 <br />