Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN-3 Page 33 of 299 <br /> <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Haul Fill fr Adj. Mat’l Storage Area to B-Seam Portal Bench Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION Task #: 014 State: Colorado Abbreviation: None <br />Date: 1/16/2013 County: Delta Filename: C083-014 <br />User: SLB Agency or organization name: DRMS HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Cat 773F -Loader: CAT 988H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 NA NA NA NA <br />Ownership cost/hour: $60.64 $82.23 NA NA NA NA <br />Operating cost/hour: $119.47 $117.03 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $25.66 $35.82 NA NA NA NA <br />Unit Subtotals: $205.77 $235.07 NA NA NA NA <br />Number of Units: 2 1 0 0 0 0 <br />Group Subtotals: Work: $646.61 Support: $0.00 Maint: $0.00 Total work team cost/hour: $646.61 MATERIAL QUANTITIES Initial volume: 53,000 CCY Swell factor: 1.165 <br />Loose volume: 61,745 LCY Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION Truck Capacity: Truck Payload (weight) Basis: <br /> Material weight: 2,900 Pounds/LCY <br /> Description: Decomposed rock - 50% Rock, 50% Earth Rated Payload: 122,520 Pounds <br />Payload Capacity: 42.25 LCY <br />