Laserfiche WebLink
CIRCES Cost Estimating Software <br />BLASTING MATERIALS QUANTITIES QUANTITY UNIT <br />Total Quantity of Stemming Required: 764.76 cubic yards <br />Total Quantity of Explosives Required: 628,332 pounds <br />Total Quantity of det. cord/fuse/wire Required: 94,760 linear feet <br />Quantity of Blasting Caps per Blasthole: 1 cap(s) <br />Total Quantity of Blasting Caps Required: 1,085 caps <br />Quantity of Primers per Blasthole: 1 primer(s) <br />Total Quantity of Primers Required: 1,085 primers <br />Quantity of Delays per Blasthole: 1 delay(s) <br />Total Quantity of Delays Required: 1,090 delays <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Description <br />Drilling Equipment - Drill: Atlas Capco DML/SP - 9-7/8” <br />-Drill Pad Preparation: Cat D11R - 11U <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery –Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: Cap Delivery Truck <br /> <br /> Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Equipment Preparation Support Support Bulk Truck Cap Truck <br /> Drilling Dozer MiscTruck MiscTruck <br />%Utilization-machine: 100 100 NA NA 100 100 <br />Ownership cost/hour: $86.05 $126.54 NA NA $67.53 $5.42 <br />Operating cost/hour: $173.42 $280.92 NA NA $83.47 $18.73 <br />Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br />Operator cost/hour: $62.43 $37.41 NA NA $27.73 $27.73 <br />Unit Subtotals: $321.90 $444.88 $0.00 $0.00 $178.73 $51.89 <br />Number of Units: 1 1 0 0 1 1 <br />Group Subtotals: $321.90 $444.88 $0.00 $0.00 $178.73 $51.89 <br />Total work team cost/hour: $997.40 <br />MATERIALS COST Description Unit Unit Cost Quantity Total Cost <br />Blasting Agent: <br />Bulk ANFO nom. density <br />( 7,900-15,000 fps ) Pound $0.234 628332.240 $147,029.74 <br />Primers or Boosters: <br />Cast primer, 1.0 lb <br />(electric or non-electric <br />system) Each $3.693 1085.000 $4,006.91 <br />Blasting Caps: <br />Non-electric cap, delay <br />(non-electric systems) Each $3.489 1085.000 $3,785.57 <br />Det. Cord, fuse, or <br />wire: <br />Detonating cord, 25 gr./ft. <br />(non-electric systems) Linear foot $0.140 94760.050 $13,266.41 <br />Delays: <br />MS connectors (non- <br />electric systems) Each $4.914 1090.000 $5,356.26 <br />Miscellaneous: <br />Stemming, 1.5 in. gravel <br />(inert blasthole packing- <br />imported) Cu. yd. $27.190 764.758 $20,793.77 <br />Drill bits: Bit life = 1,750 Linear feet $2,733.00 34.906 $95,398.10 <br /> Total Materials Cost: $289,636.76