Laserfiche WebLink
CIRCES Cost Estimating Software <br />231 Pump 15 Sediment Ponds Prior to Two Cleanings PUMPING 1 236.66 $36,493.00 <br />232 Clean 15 Sediment Ponds Two Times TRUCK1 1 668.30 $254,854.77 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />30453.5 <br /> <br /> $92,650,641.84 <br /> <br />INDIRECT COSTS OVERHEAD AND PROFIT: Liability insurance: 2.02% Total = $1,871,542.97 <br />Performance bond: 1.05% Total = $972,831.74 <br />Job superintendent: 10,400.00 hrs Total = $680,264.00 <br />Profit: 10.00% Total = $9,265,064.18 <br /> TOTAL O & P = $12,789,702.89 <br /> CONTRACT AMOUNT (direct + O & P) = $105,440,344.73 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 2.00% Total = $2,108,806.89 <br />Reclamation management and/or administration: 1.91% $2,013,910.58 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $16,912,420.37 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $109,563,062.21 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />