My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-10_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-01-10_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:57 PM
Creation date
2/22/2013 1:12:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/10/2013
Doc Name
Cost Estimate (Emailed)
From
Jim Stark
To
Rob Zuber
Type & Sequence
RN6
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Task description: Rip Facilities Area <br />Site: Colowyo Coal Mine Permit Action: Permit Renewal 06 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION Task #: 027 State: Colorado Abbreviation: None <br />Date: 1/8/2013 County: Moffat Filename: C019-027 <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Basic Machine: Cat D11R - 11U Horsepower: 850 <br />Ripper Attachment: 1-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $143.02 NA <br />Operating Cost/Hour: $280.92 100 <br />Ripper Operating Cost/Hour: $15.45 100 <br />Operator Cost/Hour: $37.41 NA <br />Total Unit Cost/Hour: $476.80 Total Fleet Cost/Hour: $1,907.19 <br />MATERIAL QUANTITIES Alternate Methods: <br />Seismic: 462,720 LCY Bank Volume: 462,720 BCY Midrange <br />Area: NA acres Rip Depth (ft): NA Volume: NA BCY or CCY Source of estimated quantity: Maps 19 and 23 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: 3,500 feet/second <br />Area: <br />Average Ripping Depth: NA mph <br />Average Ripping Width: NA degrees <br />Average Ripping Length: NA feet <br />Average Dozer Speed: NA feet <br />Average Maneuver Time: NA feet <br />Production per unit area: NA acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 2,490.40 Cu. yds./hr Site Altitude: 7,600 feet <br />Altitude Adj: 0.93 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.77 multiplier Adjusted Hourly Unit Production: 1,922.34 Cu. yds./hr <br />Adjusted Hourly Fleet Production: 7,689.36 Cu. yds./hr <br />JOB TIME AND COST Fleet size: 4 Grader(s) Total job time: 60.18 Hours <br /> <br />Unit cost: <br /> <br />$0.248 <br /> <br />Per cu. yd. <br /> <br />Total job cost: <br /> <br />$114,768.00 <br /> <br />Selected estimating method: Seismic
The URL can be used to link to this page
Your browser does not support the video tag.