Laserfiche WebLink
CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) <br />1 9000.00 2.50 3.00 5.50 1266 7.251 <br />Haul Time: 7.251 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) <br />1 9000.00 -2.50 3.00 0.50 3503 2.790 Return Time: 2.790 minutes <br />Total Truck Cycle Time: 12.832 minutes <br />Loading Tool unit <br />Production <br /> <br />4,397.74 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,650.13 <br /> <br />LCY/Hour <br />Truck Unit Production <br />545.21 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />452.52 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />8 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />8 <br /> <br />Truck(s) Adjusted hourly truck team production: 3,620.18 LCY/Hour <br />Adjusted single truck/loader team production: 3,620.18 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,240.35 LCY/Hour <br /> <br />JOB TIME AND COST Fleet size: 2 Team(s) Total job time: 5,398.25 Hours <br /> <br />Unit cost: <br /> <br />$1.403 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$54,825,046.72 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />TRUCK/LOADER TEAM WORK