Laserfiche WebLink
CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) <br />1 5000.00 -4.00 3.00 -1.00 3503 1.502 <br />Haul Time: 1.502 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 5000.00 4.00 3.00 7.00 2398 2.461 <br />Return Time: 2.461 minutes <br />Total Truck Cycle Time: 6.754 minutes <br />Loading Tool unit <br />Production <br /> <br />4,397.74 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,650.13 <br /> <br />LCY/Hour <br />Truck Unit Production <br />1,035.86 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />859.76 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />4 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />4 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 3,439.05 LCY/Hour <br />Adjusted single truck/loader team production: 3,439.05 LCY/Hour <br />Adjusted multiple truck/loader team production: 3,439.05 LCY/Hour <br /> <br />JOB TIME AND COST Fleet size: 1 Team(s) Total job time: 212.70 Hours <br /> <br />Unit cost: <br /> <br />$1.129 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$825,952.52 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />