Laserfiche WebLink
<br /> <br />CIRCES Cost Estimating Software <br />Truck Cycle Time: Truck Exchange Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br />Truck Load Time: 0.775 Minutes Adjusted for site altitude: 0.791 Minutes <br />Truck Maneuver and Dump Time: 1.20 Minutes Adjusted for site altitude: 1.200 Minutes <br /> Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) <br />1 7500.00 1.50 3.00 4.50 1786 4.589 <br />Haul Time: 4.589 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 7500.00 -1.50 3.00 1.50 3503 2.405 <br />Return Time: 2.405 minutes <br />Total Truck Cycle Time: 9.785 minutes <br />Loading Tool unit <br />Production <br /> <br />4,397.74 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />3,650.13 <br /> <br />LCY/Hour <br />Truck Unit Production <br />714.99 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />593.44 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />6 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />6 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 3,560.63 LCY/Hour <br />Adjusted single truck/loader team production: 3,560.63 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,121.25 LCY/Hour <br /> <br />JOB TIME AND COST Fleet size: 2 Team(s) Total job time: 1,159.78 Hours <br /> <br />Unit cost: <br /> <br />$1.175 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$9,706,468.76 <br /> <br />