My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-21_REPORT - C2009087
DRMS
>
Day Forward
>
Report
>
Coal
>
C2009087
>
2013-02-21_REPORT - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:13:24 PM
Creation date
2/22/2013 8:48:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REPORT
Doc Date
2/21/2013
Doc Name
2012 Annual Hydrology Report (Emailed)
From
Peabody Sage Creek Mining, LLC
To
DRMS
Annual Report Year
2012
Permit Index Doc Type
Hydrology Report
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSG1, NPDES Discharge Point 003, (also known as the Shop Reservoir or <br />the Northwest Impoundment, located just north of the mine shop area), <br />SSG2 (located approximately 0.1 mile downstream of where NPDES3 <br />discharges into Grassy Creek) and, finally, YSG5 (the furthest <br />downstream site). <br />- Surface Water Site YSGF5. This site was initially part of the <br />monitoring program for Seneca Coal Company's Yoast Mine, and is now also <br />part of the PSCM program. It is in the upper part of Grassy Creek, just <br />below the confluence of the Yoast NPDES Pond 011 discharges. Review of <br />the TDS plot indicates a slightly increasing trend, with the peak value <br />occurring in September 2010. <br />- Surface Water Site SW-S2-1 (SSG1). This site monitors Grassy Creek <br />upstream of mining at the Seneca II Mine. Review of the TDS plot <br />indicates a stable trend (SF 0.5). <br />- NPDES Discharge Point 003 (NPDES3). Hydrographs presented in Appendix <br />D show that flow has increased at this site since September 18, 1984, <br />when operation of the truck wash system began. Water is siphoned from <br />the Wedge Impoundment (NPDES2) into a holding pond. Overflow from the <br />holding pond is diverted into the shop ditch, which flows into NPDES3. <br />Water is pumped from the holding pond to the wash rack, drains into a <br />settling pond, and then into the same shop ditch. This operation has <br />increased the flow at NPDES3 while decreasing the flow at NPDES2. <br />Other events have affected the long -term hydrograph at NPDES3. They <br />include the diversion away from NPDES3 of the runoff from an inactive <br />fly ash pit (operated by the Hayden Station power plant) in October 1980 <br />and the diversion away from NPDES3 of runoff contained in the Northwest <br />Diversion Ditch (see the Seneca II Permit Application, Exhibit 7 -7, <br />Surface Water Hydrology Map and also the 1982 Seneca II AHR) in April <br />1982. Discharge volumes at the this site have also been affected by the <br />reduction in diameter of the discharge culvert (36 inches to 6 inches) <br />that occurred on July 19, 1988. A smaller volume pump and line from Pond <br />002 to the truck wash was installed in August 2001. The truck wash was <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.