Laserfiche WebLink
Total acres <br />backfilled: <br />Summit Brick & Tile Co. <br />Total acres <br />seeded w/y <br />approved mix: <br />M- 1977 -324 <br />Total acres <br />w /topsoil <br />replaced: <br />2 il <br />Total acres <br />mulched w/ <br />approved mulch: <br />r <br />VP <br />Total acres <br />graded: <br />a lb, <br />Total acres <br />fertilized w/ <br />apvd fertilizer• <br />2, � <br />Topsoil <br />replacement <br />depth (in.): <br />�� <br />4 —6 <br />Mulch application <br />rate (tons /ac): <br />WA <br />Seed <br />application <br />method: <br />664'0 4 5 i <br />C2. x Orr) <br />Fertilizer <br />application <br />method: <br />p <br />B R040 S / <br />Mulch <br />application <br />method: <br />N /i <br />Permittee Name: <br />Summit Brick & Tile Co. <br />Permit Number: <br />M- 1977 -324 <br />Operation Name: <br />Stocks Clay Mine <br />County: <br />Fremont <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />February 17, 2013 <br />Permit Acreage: <br />280.00 <br />Current Bond Amt: <br />$38,500.00 <br />-- cc4 <br />112c Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />RECEIVED <br />FEB 12 <br />Division of Reclamation, <br />Mining & Safety <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />0 <br />0 <br />o. <br />a <br />Page 2 of 3 <br />NO <br />NO <br />YES CO) <br />CED <br />