My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-02-11_REVISION - M1978116
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978116
>
2013-02-11_REVISION - M1978116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:13:09 PM
Creation date
2/21/2013 3:26:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978116
IBM Index Class Name
REVISION
Doc Date
2/11/2013
Doc Name
RESPONSE TO ADEQUACY REVIEW 1
From
COTTER
To
DRMS
Type & Sequence
AM2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
assess potential environmental impacts to questionable groundwater resources. <br />A Sampling and Analysis Plan will be submitted prior to any sampling activities. <br />17. Addressing Rule 6.4.21(14), SPLP tests were conducted in order to characterize the <br />waste rock generated at this site. According to this rule, the ore must also be <br />characterized Please submit to the Division, a geochemical evaluation of the ore to be <br />mined Alternatively, if ore samples are not available at this time, commit to submitting <br />this information to the Division, for review and approval, prior to any stockpiling on the <br />surface. <br />Prior to ore being stockpiled on the surface, Cotter will submit to DBMS a <br />geochemical evaluation of the ore to be mined for its review and approval. <br />18. Addressing Rule 6.4.21(16), on page U -20, the EPP states that design and <br />implementation of the Drainage Design Plan will be overseen by a registered <br />professional engineer. Please commit to submitting an "As Built Certification" to the <br />Division following construction. <br />Cotter will submit an "As- Built - Certification" to the Division following the <br />construction of the Drainage Design Plan facilities. <br />19. Addressing Rule 6.4.21(16), on page U -20, the EPP states that Cotter Corp. will conduct <br />regular inspections of all structures. Please inform the Division of the anticipated <br />minimum inspection frequency interval. <br />Cotter will at a minimum inspect all structures one to two times per week when <br />the mine is active and one to two times per month when the mine is inactive. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.